Mahsulotlar

Pee pad yasash mashinasi
Yakuniy mahsulot darajasi 98 foizdan yuqori yoki unga teng (elim aplikator va yopishtirishdan tashqari)






Asosiy parametr
1.1) Mahsulot o'lchami: uzunligi 350-1800 mm, kengligi 300-600 mm, qalinligi tanlanishi mumkin
1.2) Mahsulot tuzilishi: sirt qatlami, qog'oz qog'oz, pulpa, SAP, pe plyonka
1.3) Ta'minot: 380 V 50 Gts
1.4) Quvvat: 175 KVt (elim aplikatoridan tashqari)
1.5) Havo bosimi: 1100L/MIN, 6-8BAR
1.6) Yakuniy mahsulot darajasi 98 foizdan yuqori yoki unga teng (elim aplikatori va yopishtirishdan tashqari)
Model | Kengligi | Speed(m/min) | Haydash rejimi |
TO-BKA-600 | 600 mm | 300 | Toʻliq-servo |
TO-BKA-800 | 800 mm | 250 | Toʻliq-servo |
TO-BKB-600 | 600 mm | 200 | Yarim{0}}servo |
TO-BKB-800 | 800 mm | 150 | Yarim{0}}servo |
TO-BKC-600 | 600 mm | 150 | Chastotasi |
TO-BKC-800 | 800 mm | 120 | Chastotasi |
TO-BKD-600 | 600 mm | 80 | Yagona motorli |
TO-BKD-800 | 800 mm | 60 | Yagona motorli |
Ixtiyoriy qism | |
Qog'oz qurilmasini bo'shating | (optional) |
Servo motor | (optional) |
Ehtiyot qismlarning markasi va kelib chiqishi | Xitoy yoki import qismlari |
Staker | (optional) |
Qo'lda qadoqlash mashinasi | (optional) |
To'liq avtomatik qadoqlash mashinasi | (optional) |
Yelimli aplikator mashinasi | Xitoy yoki AQSh |
Qayta ishlangan pulpa qurilmasi | (optional) |
Shisha xavfsizlik eshigi | (optional) |
Kamera monitoringi tizimi | (ixtiyoriy) |
Chang yig'ish mashinasi | (optional) |
Yetkazish vaqti
1. Mashina sotuvchi depozitni olgandan keyin va namunaviy chizmalar ikkala tomon tomonidan tasdiqlanganidan keyin 120 ish kuni ichida tayyor bo'ladi.
2. Sotuvchi Xaridorga faks yoki elektron pochta orqali mashinaning tugallanganligi haqida yozma ravishda xabar beradi.
To'lov muddati:
Mashina:
1. Xaridor sotuvchiga shartnoma imzolangan kundan boshlab 14 kun ichida umumiy aloqa summasining 30 foizini TT toʻlovi orqali, 70 foizini mashina yuklanishidan oldin TT tomonidan toʻlashi shart. Mashina yuklanganidan keyin 3 ish kuni ichida yuklanadi. Qolgan 70 foizni sotuvchi oladi.
Yuk tashishdan oldin tasdiqlangan
Machine will be tested and approved in seller's factory before delivery. The time for testing in seller's factory will not be more than 15 minutes. Raw materials consumption within 15 minutes will be afforded by seller. If customer needs more time for testing, the cost will be afforded by customer
Isrof elim aplikatorining parchalanishi yoki material almashinuvi holatlarini istisno qiladi.
Sifat kafolat muddati va ish haqi
The Seller offers a 12-month quality guarantee period from the delivery date. During this period, the Seller shall repair the machine and provide repair parts (wearing parts, and parts subject to normal wear and tear (like: cutters and belts, etc)or damage attributable to the Buyer excluded). The damage attributable to the Buyer shall be repaired at the Buyer's cost. (the warranty period is valid from 30 days after the buyer is informed of the test of the machine.)
O'rnatish va sinov
1. Sotuvchi sotilgan mashinani birinchi o'rnatish va sozlash uchun javobgardir.
2. Chet elda o'rnatish va sozlash: Xaridor transport, turar joy (xona va ovqat) va tarjima uchun to'laydi, agar u sotuvchidan chet elda o'rnatish, sozlash, ishchilarni o'qitish va mashinalarga texnik xizmat ko'rsatish kabi{1}}sotishdan keyingi xizmatlarni taklif qilishni talab qilsa .
3. Xaridor uzoq vaqt davomida sotuvchi tomonidan yuborilgan-xizmatdan keyingi texnik xodimlarga kuniga 100USD to‘laydi. Uzatilgan muddat muddati 10 ish kuni ichida bo'lishi kerak.
4. If the installation can't be done for the reason attributable to the Buyer, like lack of supporting facilities or raw materials, the Buyer shall pay the technicians sent by the Seller 100 USD per day during the extended time. All the payment shall be made within three days after the installation and adjustment is completed. Otherwise, the Seller has the right to terminate after-sales service.
Muhim eslatma:
1.The wastage excludes the circumstances when glue applicator breaks down or exchange material.
2.Buyer should pay the rest payment or open the L/C to the Seller enable the Seller arrange the shipping no later than 60 days after the Seller finishes to manufacture the machine. If buyer delays more than 45 days and not finish the payment, the Seller has the right to sell the machine to other customer and won't return back the deposit to the Buyer.
3.Seller will inform Buyer come for testing the machine or machine ready information in written paper sent by fax or by email.





Issiq teglar: pee pad ishlab chiqarish mashinasi, Xitoy, ishlab chiqaruvchilar, zavod, narx
-
Bir martali ishlatiladigan it padini yasash mashinasiko'proq ko'rish> -
Potty trening pad tayyorlash mashinasiko'proq ko'rish> -
Bir martali ishlatiladigan uy hayvonlari uchun pad mashinasiko'proq ko'rish> -
Kuchukchalar uchun o'quv qo'ltiqlari mashinasiko'proq ko'rish> -
Uy hayvonlari uchun pad mashinasiko'proq ko'rish> -
Uy hayvonlari uchun o'quv padini yasash mashinasiko'proq ko'rish>








